No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. RYAN SYAWAL CONSULTANT - 01.951.712.7-216.000 | 76,0 | 96,0 | 98,0 | Rp. 145.299.000,00 |
Rp. 145.299.000,00 |
100,0 | 98,4 | |||||||||
2 | CV. BUHARA PERSADA - 31.664.998.7-216.000 | 100,0 | Tidak hadir saat pembuktian kualifikasi | ||||||||||||||
3 | CV. IRVOTEC RIAU CONSULTANT - 02.611.000.7-216.000 | 96,0 | 96,0 | ||||||||||||||
4 | PT. SANDI ARIFA CONSULTANT - 01.554.713.6-216.000 | 98,0 | 98,0 | 92,51 | |
|
|||||||||||
5 | PT. PERSADA NUSANTARA CONSULTANT - 94.307.474.0-216.000 | 96,0 | Tidak hadir saat pembuktian kualifikasi | ||||||||||||||
6 | PT. MITRA UTAMA ESTUARI - 03.250.774.1-211.000 | 28,0 | Nilai tidak mencapai ambang batas kualifikasi | ||||||||||||||
7 | PT. SPECTA GRAHA KONSULTAN - 02.117.879.3-216.000 | 74,0 | Tidak hadir saat pembuktian kualifikasi | ||||||||||||||
8 | Astadeca Teknik Konsultan - 83.093.416.2-003.000 | ||||||||||||||||
9 | CV. JASA REKA MANDIRI CONSULTANT - 02.805.060.7-201.000 | ||||||||||||||||
10 | PT. PANCA MANDIRI ENGINEERING - 94.446.626.7-216.000 | ||||||||||||||||
11 | PT AFIZA BILLIMKO KONSULTAN - 95.260.152.4-201.000 | ||||||||||||||||
12 | CV. SIAK RIVER CONSULTANT - 72.099.509.1-216.000 | ||||||||||||||||
13 | PT. CALVINDAM JAYA EC - 02.075.462.8-216.000 | ||||||||||||||||
14 | PT. INDONESIA CONSULTAN TEKNIK - 93.709.039.7-216.000 | ||||||||||||||||
15 | CV. ALAM DIMENSI INDONESIA Consult - 02.327.349.3-211.000 | ||||||||||||||||
16 | gatra consultant - 03.214.502.1-216.000 | ||||||||||||||||
17 | CV. INTERIOR CONSULTANT - 01.894.496.7-211.000 | ||||||||||||||||
18 | PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak